It is well known that most construction projects in Pune Strip exposed to time overruns and material wastage or both. This phenomenon may affect the progress of construction industry in Pune Strip as well as may expose many institutions of construction to be destroyed. Literatures of previous studies were studied and most related resear
ches were reviewed which included the study of these factors in many states. The aim of this research paper is to assess factors influencing time overruns and material wastages on construction projects in residential project particulary. This study was carried out based on literature review and a questionnaire survey that was obtained from contracting companies, consultants and owners in Pune Strip.
Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-3 | Issue-6 , October 2019,
URL: https://www.ijtsrd.com/papers/ijtsrd28045.pdf
Paper URL: https://www.ijtsrd.com/other-scientific-research-area/other/28045/analytical-study-between-construction-material-wastage-and-time-overrun/ar-chandarani-patil
peer reviewed journals, call for paper chemistry, ugc approved journals in mathemetics
No comments:
Post a Comment